PRE-CONSTRUCTION TREATMENT
This treatment aims at creating chemical barriers in the soil beneath the building structure to deny access for termites. Thorough inspection of the premises to be treated and adjacent perimeters.
- Treatment shall be made only at times when soil will retain toxicant to avoid surface flow. Not to apply immediately after heavy rains.
- Apply toxicant with a pressure from power sprayer.
- Apply foundation and wall footings at the rate of 4 liter solution of termiticide solution per linear meter and square meters on foundation.
- Apply an over-all treatment under entire surface of floor slab, after final grading and prior to poring of concrete, at the rate of 4 liter solution of termiticide per square meter.
- Apply 4 liter solution per linear meter along the outside walls of the building.